Lower Thorpe Viaduct
‘The strategic design approach applied to these double composite structures has been a game-changer in how we’re building these viaducts. The double composite solution can be applied to multiple structures in different locations, and we have five across EKFB’s 50-mile route that are all well into construction’
Janice McKenna, Technical Director - EKFB
Piers are widely spaced to allow the landform to continue beneath the structure and the abutments are recessed into the approach earthworks. This minimalist approach privileges landform over structure. At the detail level additional texture is incorporated into the design of the piers and parapets. The fine scale relief applied to the structure in these locations importantly addresses views near to and obliquely along the structure from Banbury Lane.